Versions

 

OFS-5.1.11

A supplementary or replacement prospectus must be submitted to the CBB as soon as practicable if, during the validity period of a prospectus, the issuer becomes aware that the prospectus is deficient or outdated in that:

(a) The prospectus contains a material statement that is false or misleading;
(b) There is a material omission from the prospectus;
(c) There has been a significant change affecting information in the prospectus; or
(d) A significant new matter has arisen, and the prospectus content requirements would have required information on that matter to have been included in the prospectus, if the matter had arisen when the prospectus was being prepared.
January 2014