Versions

 

CSD-2.2.14

If the CBB determines that the criteria specified in rule CSD-2.2.13 have been met as regards a designated system, it shall issue in respect of the system a certificate certifying to that effect ("certificate of finality"), and specify a date and time from which the certificate shall have effect.