Versions

 

CA-14.13.22

If an instrument has a shorter maturity than the liquidity horizon or a maturity longer than the liquidity horizon is not contractually assured, the IRC must, where material, include the impact of potential risks that could occur during the interval between the maturity of the instrument and the liquidity horizon.

Added: January 2012