CM-5.10.8

Past version: Effective from 01 Jan 2011 to 31 Mar 2014
To view other versions open the versions tab on the right

The CBB may allow the limits in paragraphs CM-5.10.6 and CM-5.10.7 above to be exceeded, provided that the concerned bank has addressed the points outlined in paragraph CM-5.10.10 to the satisfaction of the CBB. Any excesses above the limits in paragraphs CM-5.10.6 and CM-5.10.7 must be deducted as per the deduction requirements of Module PCD-2.

Added: January 2011