Versions

 

GR-5.1.1

Licensees must obtain prior approval from the CBB for any of the following changes to their controllers (as defined in Section GR-5.2):

(a) A new controller;
(b) An existing controller increasing its holding from below 20% to above 20%;
(c) An existing controller increasing its holding from below 50% to above 50%; and
(d) An existing controller reducing its holding from above 50% to below 50%.
October 2010