RM-2.4.5
The minimum provisioning levels set out above must be taken on the net amount of the outstanding facility after deducting the eligible collateral. If a
July 2014
The minimum provisioning levels set out above must be taken on the net amount of the outstanding facility after deducting the eligible collateral. If a