BR-2.2.16

Past version: Effective from 01 Jan 2013 to 31 Mar 2016
To view other versions open the versions tab on the right

If, as a result of circumstances outside the licensee's knowledge and/or control, one of the changes to their controllers specified in Paragraph GR-5.1.1 is triggered prior to CBB approval being sought or obtained, the licensee must notify the CBB on the earlier of:

(a) The moment the change takes effect; or
(b) The moment the controller becomes aware of the proposed change (ref. GR-5.1.7).
January 2013