Controllers
BR-2.2.19
If, as a result of circumstances outside the
licensee's knowledge and/or control, one of the changes to theircontrollers specified in Paragraph GR-5.1.1 is triggered prior to CBB approval being sought or obtained, thelicensee must notify the CBB as soon as it becomes aware of the fact and no later than 15 calendar days after the change occurs (ref. GR-5.1.4).October 2010BR-2.2.20
As specified in Article 52 of the CBB Law, a
licensee must notify the CBB of the following events:(a) If effective control over alicensee takes place indirectly whether by way of inheritance or otherwise;(b) Gaining control directly as a result of any action leading to it; or(c)The intention to take any of the actions that would lead to control.October 2010